POrtable clean power for active sites

Replace diesel-dependent temporary power with silent, modular BESS built for demanding construction site conditions.
In collaboration with ERE Pte Ltd, we deploys EH-One+ systems for safer, cleaner and more efficient worksites.

power for construction needs

Construction projects often require temporary power long before permanent electrical infrastructure is available. Conventional solutions such as diesel generators introduce challenges including noise control, emissions, fuel logistics, and ongoing maintenance.

Our clean portable BESS offer a practical alternative, enabling safe, quiet, and reliable power deployment across different stages of construction.

IN COLLABORATION WITH:

Designed for construction environment

The EH-One+ is developed specifically for professional use on construction and industrial worksites. Unlike consumer-grade portable batteries, the EH-One+ is engineered to support sustained loads, frequent use, and demanding site conditions.

Key characteristics include:

  • Industrial-grade construction suitable for worksite environments

  • High-capacity output to support professional tools and equipment

  • Modular and scalable configurations for different site requirements

  • Silent operation with zero on-site emissions

supporting site operations

A Practical Alternative to Diesel Power. Supporting Cleaner & Quieter Worksites.

  • Suitable for residential, commercial, and enclosed environments.

  • Removes the need for fuel delivery, storage, and refuelling.

  • Lower maintenance and manpower requirements.

  • No combustion, exhaust fumes, or hot surfaces.

  • Aligns with ESG requirements and regulatory considerations.

Past projects

  • SAMWOH & LTA

    SAMWOH & LTA

    Large-scale LTA civil engineering works required dependable temporary power across multiple active work zones. The solution needed to reduce diesel dependency while maintaining uninterrupted site operations under tight timelines and regulatory oversight.

  • CHEC & lTA

    Large-scale MRT construction required reliable power for night-time operations, where noise restrictions and continuous diesel usage posed operational challenges. The deployment enabled stable, low-noise power delivery to support critical works during restricted hours.

  • GIM TIAN

    Civil road works and jet washing activities required mobile, dependable power across shifting work zones. Traditional diesel setups introduced noise, emissions, and logistical inefficiencies in dynamic site conditions.

  • iso team

    ISO Team

    Simultaneous operation of three gondolas and high-load equipment required 3-phase power, which was complex and time-consuming to secure in residential zones.

  • Hsb & ktc group

    Confined underground works required reliable handtool power in enclosed spaces where diesel fumes and complex earthing posed safety risks.